ORSOFT’s planning products enable our customers to address these functional requirements integrated with SAP ERP or S/4HANA within one solution.
There is no need to create a custom master data base and interfaces.
Even after a short period of time, potential benefits such as improvements in delivery reliability, reduction of non-quality costs, reduction of changeover and idle times, as well as reduction of safety stocks can be tapped.
Continental Emitec GmbH | Georg Fischer GmbH | Hirschvogel Holding GmbH | ZF Friedrichshafen AG | Continental Emitec GmbH | Georg Fischer GmbH | Hirschvogel Holding GmbH | ZF Friedrichshafen AG | Continental Emitec GmbH | Georg Fischer GmbH | Hirschvogel Holding GmbH | ZF Friedrichshafen AG | Continental Emitec GmbH | Georg Fischer GmbH | Hirschvogel Holding GmbH | ZF Friedrichshafen AG |
Read more about combined solutions SCM + Quality Management or SCM + Production Efficiency here.
Continental Emitec GmbH: "Increase of transparency. Effective information flow." | ZF Friedrichshafen AG: "Delivery performance of one of our most important suppliers has been increased from 80% to 100%." | Vossloh Locomotives GmbH: "High level of transparency." | Continental Emitec GmbH: "Faster reactivity to change requests of customers. Higher plant flexibility." | ZF Friedrichshafen AG: "The average consumption range has been decreased from 12 to 4 working days." | Continental Emitec GmbH: "Increase of planning cycles from once a week to twice a week." | ZF Friedrichshafen AG: "" | Continental Emitec GmbH: "Reduction of planning time, from 6h to 2h a planning cycle." | ZF Friedrichshafen AG: "Transparency about demand, supply, workload in %, bottlenecks of machinery, delays and an overview about all alternatives." | Continental Emitec GmbH: "Simplification of material disposition by a transparent demand exposure." | ZF Friedrichshafen AG: "Flexibility: Faster assorting of plants/accounts/machines possible. / Faster rescheduling at bottlenecks (internal/external). / Rescheduling of running orders possible (in SAP R/3 not possible)." | Continental Emitec GmbH: "Less rescheduling effort due to a distinct exposure of switching bottlenecks." | ZF Friedrichshafen AG: "Rescheduling with consideration of customer requests delivery dates." | Continental Emitec GmbH: "Reduction of planning mistakes via elimination of manual data transfer and a larger overview." | ZF Friedrichshafen AG: "Result simulation (default order and alternative workload). Rescheduling at push button." | Continental Emitec GmbH: "Improvement of delivery performance." | Continental Emitec GmbH: "Reduction of planning errors and transfer errors." |